John Lewis, Nottingham - Service Building
Client: John Lewis Partnership
Sectors: Distribution Centres
Services: Low Carbon MEP Design
Major refurbishment with new high bay extension and loading bays.
Continued growth of John Lewis selling space created a need for additional or combined distribution depots to service the extended requirements.
John Lewis' existing distribution depot in Nottingham (Arnold) was identified as a key facility to provide services to existing and future branches in the surrounding area. The key element of the works was to create additional space within a space by redesigning the mezzanine layout and upgrading / altering the existing mechanical and electrical systems.
Lateral Technologies & Solutions Ltd's design included modifications to existing heating, ventilation, air conditioning and domestic hot water systems, main electrical distribution, fire alarms, lighting and sprinkler systems.